Buena Práctica / Bonne Pratique / Boa Prática |
|
NOMBRE NOM NAME |
PILOT PROJECT REHABILITE PROJECT GAZ BOILER REPLACEMENT BY A BIOMASS BOILER IN URBAN RESIDENTIAL AREA |
Localización Localisation Localização |
Sarriguren Ecocity (Navarra), municipality located in the Pamplona Region |
Tipología – Naturaleza Typologie – Nature Tipologia – Natureza |
Marketing and demand; study of the use of biomass in urban collective residential area. |
Periodo de aplicación Période d’application Período de aplicação |
Facility implementation in 2019. |
Principales objetivos Principaux objectifs Período de aplicação |
Emissions reduction and green energy production. Promotion of the use of biomass in urban residential areas. Pilot Project for the ‘Navarra Social Housing’ plan of the Navarra Government. |
Descripción detallada de la práctica o proyecto Description détaillée de la pratique ou du projet Descrição detalhada da prática ou projeto |
Navarra de Suelo y Vivienda, S.A (NASUVINSA), is partner of the Project “REHABILITE Plataforma transnacional de apoyo a la rehabilitación energética” from the programme Interreg SUDOE (Project identification number SOE1/P3/E0294) of the European Regional Development Fund (ERDF). One of the pilot actions planned will be developed by NASUVINSA, specifically the implementation of a facility for the generation of energy, fueled by biomass that will supply 51 dwellings ( 5650 sqm build-up area) located in two buildings in 22-24, Reino de Navarra avenue, Sarriguren, both property of NASUVINSA and intended to rental social housing. Both dwellings share a boiler room in the basement. There are located both existing boilers fueled by natural gaz (2 x 350 kW) for heating and hot sanitary water. Boiler room is renovated for the implementation of an storage room (62 m3) and replacement of boilers by a new one fueled by biomass (300 kW) that will work as the master boiler and maintaining other existing two as punctual support for demand peaks or maintenance works of the facility. An analysis and technical-financial study of the type of chip and boiler for the urban residential area is done. Chip characteristics (granulometry, humidity, fly ash…) and different type of boiler for their implementation are studied. The engineering project studies with special interest the aspects related to protection against fire and storage room security together with general aspects of the boiler room as protection against noise and vibrations. In addition, additional measures as monitoring and control are implemented. Regarding to chip supply, collaboration options between public companies of the region are studied. Thus, this Project is the base of the biomass facilities that will be implemented in all the buildings of the ‘Navarra Social Housing’ plan. These 524 dwellings (that will be Nearly Zero Energy Buildings) will be supplied by biomass chips. |
Agentes involucrados Agents impliqués Agentes envolvidos |
NASUVINSA – Navarra de Suelo y Vivienda, S.A. |
Evaluación de resultados y lecciones aprendidas Évaluation des résultats et les leçons apprises Avaliação de resultados e lições aprendidas |
The Project is currently ongoing, following results are previewed:
In the previous studies is noted that an adequate facility implementation with the appropriate solution in this kind of urban areas together with the control and guarantee of different aspects as they are:
|
Fotografías Photos Fotos |
|
Solución a los retos territoriales Solution aux défis territoriaux Solução para os desafios territoriais |
It is pretended that the Project will bring confidence to the citizenship and it will foster the biomass demand in residential urban areas. It is expected a multiplying effect of this type of facilities in the region. This increase of demand will produce employment increase in the sector and its valorization. |
Solución a un mayor nº de retos territoriales (a completar más adelante) Solution à un plus grand nombre de défis territoriaux (à compléter plus tard) Solução para um maior número de desafios territoriais (a ser completado depois) |
|
Información de contacto Information de contact Informação de contato |
Maitane Zazu Architect NASUVINSA – In charge of REHABILITE Project in Navarra 848420665 |